Final Report Erratum:
on the bombing of the Alfred P. Murrah Federal Building.



ERRATUM    edition 91701

 

In the Final Report on the Bombing of the Alfred P. Murrah Building, errata should be corrected as follows:

 

Page1, line1 IS: 9:04 a.m.  SHOULD BE 9:02 a.m.

 

Page 1, line 16 IS: 60 miles east of Oklahoma City in Perry, Oklahoma,

SHOULD BE: 60 miles north of Oklahoma City in Perry, Oklahoma.

 

Page 2, line 27-28 IS: a single bombing victim as a witness.  SHOULD BE: a single John Doe #2 witness.

 

Chapter V., Section G. entitled, "Evaluation of Published Explanations Concerning the Structural Collapse of the Alfred P. Murrah Federal Building", errata in image captions should be corrected as follows:

 

Page 217:

Figure 6 -- IS: "Structural Damage Associated with Failed Column G16[A7]".

Figure 6 -- SHOULD BE: "Schematic of Failure Mode Common to Columns G16[A7], G20[A5] and G24[A3]"

 

Page 228:

Photo 5 -- IS: "Tracked Excavator Parked in Crater -- with Perspective-Corrected Grid".

Photo 5 -- SHOULD BE: "Tracked Excavator Parked in Crater"

 

Page 244:

Photo 8 -- IS: "Brisance-damaged structural material".

Photo 8 -- SHOULD BE: "Removal of Stub of Column G16[A7] During "Site Sanitization" Process"

 

Page 249:

Photo 9 -- IS: "PUSHED-over Wall Column".

Photo 9 -- SHOULD BE: "Displaced "Column Wall" Behind Column G16[A7]"

 

Page 250:

Figure 11 -- IS: "Wall Column Behind Column G20[A5]".

Figure 11 -- SHOULD BE: "Positions of Major Elements After Collapse -- with Blast Incidence Angles"

 

Page 251:

Photo 10 -- IS: "Destroyed Top of Wall Column".

Photo 10 -- SHOULD BE: "Severely-damaged "Column Wall" Behind Column G24[A3]" 4

 

Page 252:

Figure 12 -- IS: "Wall Column Supporting End of Lateral Beam".

Figure 12 -- SHOULD BE: "Linked Structures Associated with "Column Wall" Behind Column G24[A3]"

 

Page 254:

Figure 13 -- IS: "Mechanism of Failure for Wall Column".

Figure 13 -- SHOULD BE: "Possible Failure Modes Associated with "Column Wall" Behind Column G24[A3]"